

FLL 2019: How to Accomplish Mission 09 and return the house with LEGO Education SPIKE Prime
Raw footage of the mission. Might upload a more polished version soon
- #1696
- 11 Mar 2021
Raw footage of the mission. Might upload a more polished version soon
The robot moves your Innovation Project onto the RePLAY logo or the gray area around the bench (M04).
Only one counts per stack
If an Upgrade (solar panels, roof garden, insulation) is Independent, and Supported only by a Stack which is at least partly in any Circle:
(mission descriptions source https://www.first-lego-league.org/)
Bring the blocks to a specific place on the field in a specific way
score one or the other
If there is a team-designed Structure clearly bigger than a Blue Building Unit, built only from your white LEGO bricks
Note: Design and build your own Structure before you compete, then bring that to each Match. You don’t build it during the Match.
Note: Your mission 11 Structure needs to be built from Bag 10 elements only. It can include the red and gray elements. Not all of the Bag 10 elements need to be used.
(mission descriptions source https://www.first-lego-league.org/)
This is the first run of Team "Nightbeast", with which they solve M01 and M02 from FIRST LEGO League 2019 Into Orbit:
The after season review continues. No. We are not publishing a single solution for the next season before it is over, but let's learn from the previous season. The current tutorial is about three missions at once on a single run with the robot. Most FIRST LEGO League teams try to accomplish one-two missions on a single run out of the base, and three is really what makes the difference
Many teams have followed the same idea as the ELM team. To build a LEGO Mindstorms attachment for the robot and to lift the truck very lightly. In this way they could more the truck and place it in the special region. See what the ELM idea was.